Independent third-party verification of offshore structures such as risers, flowlines and fixed and floating offshore wind systems for operators and developers around the world.
Discuss a project with us
Get in touchContact us
If you have a project we can help with or need some technical advice, please get in touch! One of our engineers will be happy to have a chat. Please provide some details below and and we will respond as soon as we can.
Key Personnel

Mike Campbell
Global Director, USA

Mike Campbell
Global Director, USA
About
Mike is a Global Director and vice president of 2H’s Houston office, where he is responsible for the management of the engineering group. Mike has over 22 years of experience dedicated to riser engineering, ranging from conceptual design and feasibility to detailed design, installation, monitoring and operational integrity management for all types of riser systems and subsea equipment. He has authored numerous technical publications including fatigue analysis methods and the use of field measurements to benchmark and improve design tools. Mike is a graduate of the University of Sheffield, UK, and has a bachelor’s degree in mathematics and physics.
Yusuf Arikan
Senior Principal Engineer
About
Yusuf Arikan has over 15 years of structural engineering and project management experience in the design and analysis of various offshore structures including hydrodynamics of various floating offshore wind foundations. In recent years, he has been extensively involved in floating offshore wind projects, specifically the coupled assessment of the floater & turbine, and the design and analysis of mooring systems and power cables.
Yusuf holds a Bachelor’s degree from Bogazici University, Turkey and a Master’s degree from the University of Houston. He is a registered Professional Engineer (PE) in Texas and Project Management Professional (PMP).
Language
Independent and highly experienced verification team
Our extensive experience in design, fabrication, and installation makes us the right provider to conduct verification activities for all types of offshore systems such as SCRs, TTRs, hybrid risers, flexible risers, fixed wind piles, floating wind mooring lines and power cables, minimum facility platforms, and subsea flowlines.
We are also one of the only companies to conduct CVA activities for gas lift umbilicals.
Global verification services for offshore renewables and oil and gas
We have performed independent third-party verification of offshore structures across the globe including the US, Guyana, offshore Africa and Asia. For systems in US waters, this is carried out as a certified verification agent (CVA). Independent verification is a requirement of the Bureau of Safety and Environmental Enforcement (BSEE) for certain offshore structures. Under 30 CFR 250.910(B)(1)(i) and (2)(i), pipelines connected to floating platforms are subject to the platform verification program as associated structures. Similarly, renewable energy and alternate uses of existing facilities in the outer continental shelf are also subject to CVA requirements per 30 CFR 585.
Key Services
Review and validation of design and installation documentation and procedures
Certified verification agent (CVA) – design, fabrication, and installation
Monitoring of fabrication and installation
Review and validation of existing designs and installed systems
GoM riser life extension CVA
US fixed and floating systems CVA
Project Experience
NNG Wind Farm – Casing Grouting Verification
Noble Energy – Big Bend-Dantzler SCR and Gas Lift Umbilical Design, Fabrication and Installation CVA
Tullow Oil – Jubilee Flexible Risers Procurement Management
Hess/Williams – Tubular Bells Design, Fabrication and Installation CVA
Hess/Enbridge – Stampede Design, Fabrication and Installation CVA
Noble Energy – Gunflint SCR Design, Fabrication and Installation CVA
Chevron – Jack St. Malo Production and Export SCR Design, Fabrication and Installation CVA
ATP – Mirage MinDoc TTR Design CVA
BP – Horn Mountain Spar TTR Design Verification
Petrobras America Inc. – Cascade Chinook Chain Link Fatigue Life Independent Analysis Confirming Design
BP – Dorado and Galapagos Production SCR Design CVA
Chevron – Tahiti Development Production and Export SCRs CVA
ExxonMobil – Erha Production SCRs Design Verification
Statoil – Peregrino Weight Aided Wave (WAW) Risers Re-Analysis Study
ATP Oil & Gas – Gomez and Telemark Oil Flexible Catenary Riser Design, Fabrication and Installation CVA
Talow ERT – Phoenix Flexible Lazy Wave Risers Design, Fabrication and Installation CVA
Afren Okoro – Composite Flexible Riser As-Installed Verification
Key Personnel

Mike Campbell
Global Director, USA

Mike Campbell
Global Director, USA
About
Mike is a Global Director and vice president of 2H’s Houston office, where he is responsible for the management of the engineering group. Mike has over 22 years of experience dedicated to riser engineering, ranging from conceptual design and feasibility to detailed design, installation, monitoring and operational integrity management for all types of riser systems and subsea equipment. He has authored numerous technical publications including fatigue analysis methods and the use of field measurements to benchmark and improve design tools. Mike is a graduate of the University of Sheffield, UK, and has a bachelor’s degree in mathematics and physics.
Yusuf Arikan
Senior Principal Engineer
About
Yusuf Arikan has over 15 years of structural engineering and project management experience in the design and analysis of various offshore structures including hydrodynamics of various floating offshore wind foundations. In recent years, he has been extensively involved in floating offshore wind projects, specifically the coupled assessment of the floater & turbine, and the design and analysis of mooring systems and power cables.
Yusuf holds a Bachelor’s degree from Bogazici University, Turkey and a Master’s degree from the University of Houston. He is a registered Professional Engineer (PE) in Texas and Project Management Professional (PMP).