Composite pipe design and verification requires a multi-disciplined approach. Key activities include: manufacturing and quality control, local cross-sectional finite element…

Drilling riser ready for damping test

2H Offshore has completed drilling riser structural damping tests and developed a new model to improve drilling and conductor fatigue…

2H Offshore recently joined forces with sister company Claxton Engineering on their project to provide a rental HPHT riser system to Statoil…