Cost Optimisation Strategies for Offshore Wind Turbine Foundations
EVENT: SUT China
1 Oct 2021
This presentation will cover the following:
Fixed Offshore Wind Turbine (FOWT) Conventional Foundation Design
Foundation Design Features
Challenges in Conventional Design
Cost Optimisation Strategies
Pre-installed Piles for FOWT Foundation
Optimised Grouped Pile Design
Monopod with Split Suction Can Foundation Template
Installation Strategy
Cost Comparison
Author
Shreenaath Natarajan
Global Director, Malaysia
Shreenaath Natarajan
Global Director, Malaysia
About
Shreenaath holds a Master’s degree in Engineering from the University of Texas, Austin, and has almost 20 years of specialist experience in minimum facility platforms, novel installation methods, deepwater riser engineering, naval architecture, marine hydrodynamics, subsea monitoring, and integrity management of subsea systems. Has been responsible for delivering several EPCI / turnkey minimum facility platforms and deepwater riser systems delivery as a project manager/sponsor ensuring technical, commercial and contracts management from concept to installation. Shreenaath has also been responsible for the day-to-day operations, project management and business development for the Asia Pacific region.