Cost Optimisation Strategies for Offshore Wind Turbine Foundations

EVENT: SUT China

1 Oct 2021

This presentation will cover the following:

Fixed Offshore Wind Turbine (FOWT) Conventional Foundation Design 

  • Foundation Design Features 

  • Challenges in Conventional Design 

Cost Optimisation Strategies 

  • Pre-installed Piles for FOWT Foundation 

  • Optimised Grouped Pile Design 

  • Monopod with Split Suction Can Foundation Template 

  • Installation Strategy 

  • Cost Comparison 

Author
Shreenaath Natarajan

Global Director, Malaysia

View bio

Download Technical Presentation