TLP Top Tensioned Riser Design Challenges in Deepwater

Event:
TLP Top Tensioned Riser Design Challenges in Deepwater
Date:
August 2013
Author:
D.Reagan

Agenda:

  • TTR System & Wellbay Interfaces for TLP
  • Riser weight management
  • Flexible and umbilical routing and attachment
  • Tensioner system
  • Drilling strategy

If you would like a copy of this technical paper register to download it (pop-up form).

 

Back to All Technical Papers

Services