This presentation discusses the following:

Captain B overview
• Conductor and riser system overview
• Operational timeline

Global riser analysis activities
• Historical fatigue assessment
• Residual fatigue life for sidetrack operations
• Fatigue challenges

Wellhead dislocation
• Examination of recovered wellhead
• Wellhead thermal growth study

Wellhead clamp design
• Clamp overview
• FE Analysis
• Manufacture and testing