Large-scale riser field tests involving life size models are not conducted very often due to the scale of the equipment…

Rigid jumper engineering

2H modified and optimised the design of a prefabricated rigid jumper kit and provided Tullow with a solution that reduced…

drilling riser tension ring

2H helped a client schedule and prioritise plug and abandonment operations for old exploration wells in the North Sea.

Composite pipe design and verification requires a multi-disciplined approach. Key activities include: manufacturing and quality control, local cross-sectional finite element…

Drilling riser ready for damping test

2H Offshore has completed drilling riser structural damping tests and developed a new model to improve drilling and conductor fatigue…

2H Offshore recently joined forces with sister company Claxton Engineering on their project to provide a rental HPHT riser system to Statoil…

Chevron Tahiti’s riser and flowline monitoring system was designed and supplied by 2H Offshore in 2009. It was the first…

Designing for HPHT conditions presents a number of engineering challenges which can push conventional subsea technology designs to their limits….