Delivering Robust, Reliable and Efficient Pre-Piling Templates for Offshore WTG Jacket Installation
Learn about important considerations in designing and delivering WTG jacket pre-piling templates that ensure robust, reliable, efficient, and safe piling operations.
21 Aug 2021
Author
Ben Andrew
Director, UK
About
Ben has over 17 years of specialist engineering experience in the design and analysis of offshore platforms, foundations, cables, and riser systems. He has held numerous project management and technical leadership roles on a variety of projects from concept through to detailed design based out of our London, Kuala Lumpur and Houston offices.
As one of the UK directors, Ben’s current focus is on the development of our minimum facilities platforms and fixed offshore wind offerings for the European, Middle East and Africa markets. Ben is a graduate of Oxford and Imperial Universities with a Bachelor’s degree in Mathematics, and a Master’s in Quantum Physics.
Insights
Author
Ben Andrew
Director, UK
About
Ben has over 17 years of specialist engineering experience in the design and analysis of offshore platforms, foundations, cables, and riser systems. He has held numerous project management and technical leadership roles on a variety of projects from concept through to detailed design based out of our London, Kuala Lumpur and Houston offices.
As one of the UK directors, Ben’s current focus is on the development of our minimum facilities platforms and fixed offshore wind offerings for the European, Middle East and Africa markets. Ben is a graduate of Oxford and Imperial Universities with a Bachelor’s degree in Mathematics, and a Master’s in Quantum Physics.