Composite pipe design and verification requires a multi-disciplined approach. Key activities include: manufacturing and quality control, ...
Drilling riser ready for damping test
2H Offshore has completed drilling riser structural damping tests and developed a new model to improve drilling and conductor fatigue ...
2H Offshore recently joined forces with sister company Claxton Engineering on their project to provide a rental HPHT riser system ...
Chevron Tahiti's riser and flowline monitoring system was designed and supplied by 2H Offshore in 2009. It was the first fully ...
Designing for HPHT conditions presents a number of engineering challenges which can push conventional subsea technology designs to ...
2H Offshore's Brazil office carried out a detailed design project with Subsea 7 for an uncoupled free-standing riser system for Petrobras' ...
2H Offshore was responsible for the detailed design and analysis of the nine single line hybrid risers for Heerema Marine Contractors ...